Jaybird™ 3 Inch Tri Clover Blow Off Tube with 2 Inch Tri Clover Connect
3" TC base with 2" diameter pipe extending up to 2" TC flange.
Height from TC cap to TC flange is 2-1/4".
1/2" blow off tube extends horizontally 9-1/2" from backbend to backbend.
Blow off height at terminal end is 3-3/4".
Height can be extended by 1-4 feet by adding our extension tube which connects via a double-ended compression fitting, (SKU #3841, sold separately).